The project brief mandated the incorporation of a mezzanine deck on the OSV for the mobilization of diving equipment.
GLO Marine was tasked with prefabricating and delivering the mezzanine deck to the destination yard.
The challenge in this project was that our surveyors had to closely monitor the process to ensure adherence to all design specifications and guarantee product accuracy across 3 modules
Each deck module has been prefabricated and shipped independently.